
HONG KONG · SHENZHEN · SINCE 2005
Product Development and Contract Manufacturing in Shenzhen & Hong Kong
Design to retail-ready product, made in our own factories in Guangming, Shenzhen. 20+ years in business.
TRUSTED BY


CLIENT TESTIMONIALS
THREEGON TESTIMONIALS

On every occasion they have met or exceeded expectations
Sean Parsons, CEO, Ellume

I cannot recommend highly enough
Leo Trottier

A pleasure to deal with.
Peter Gordon

AUDITED · CERTIFIED
A contract manufacturer, audited and certified
Passed The Home Depot responsible sourcing factory audit (Sept 2026)
ISO 9001 · ISO 13485

FOR INDUSTRIAL DESIGNERS & ID FIRMS
A manufacturing partner for designers
OEM only, under NDA. We give early DFM input and keep your design intact through production.

01 · DESIGN FOR MANUFACTURING
Design for manufacturing, before tooling
We check your design can be made efficiently, then quote tooling and unit costs for different volumes.
Fill-time simulation by O. K. Foundry Company, Inc., CC BY 2.0. Modified: cropped and placed on a dark background.
Read our DFM checklist for medical plastic housings
HOW A PROJECT RUNS
From design to production: our product development process
STEP 01
Concept review and NDA
You share drawings, 3D CAD or a prototype, and we sign an NDA first if you need one.
STEP 02
DFM and quotation
We review your design for manufacture, then quote tooling and unit costs for different volumes.
STEP 03
Prototyping
Prototypes or soft-tool samples check fit, function and appearance before production tooling.
STEP 04
Tooling
We design and machine the molds in-house in Shenzhen: first samples in 4–6 weeks for simpler tools or 6–10 weeks for complex ones.
STEP 05
T0 and T1 samples
T0 parts are the first shots off the new tool; after tool corrections, T1 parts are usually the first sent to you.
STEP 06
Engineering build
The first samples of your new product, with fit, function and appearance checked together.
STEP 07
Testing and quality control plan
We write the quality control plan from your product specification and test the product for real-world use and regulatory standards.
STEP 08
Modifications and sign-off
We fine-tune the product, then you approve pre-production samples before production starts.
STEP 09
Pilot run
A first production run checks the line, fixtures, packaging and inspection before full quantities.
STEP 10
Mass production and quality checks
Parts are molded and assembled, with ISO 13485 cleanroom assembly when needed, and checked at incoming, in-process and final inspection.
STEP 11
Packing and shipping
Products are packed ready for retail and shipped by our shipping team, or handed to your own forwarder.

02 · TOOLING
Injection mold tooling, in-house in Shenzhen
Tools designed and machined in our own factory: first samples in 4–6 weeks (simpler tools) or 6–10 weeks (complex).
What drives tooling lead times
THREEGON IN BRIEF
Threegon in brief
Who we are
Threegon (SCF International Limited) is a product development and contract manufacturing company, founded in 2005, with 20+ years in business. Its Managing Director is Scott Fong.
What we do
Threegon takes plastic-engineered products from design through DFM, injection mold tooling, injection molding and final assembly, ready for retail. We also define the quality control plan, test the product, and provide ISO 13485 cleanroom assembly for medical plastic products.
Products we have taken from design to production · Prototype to production in China
Who we work with
Brand owners bringing new products to market, and industrial designers and ID firms that need a manufacturing partner for their clients’ designs. We are OEM only: we sign an NDA before you share design files and make products only under your brand.
Where we are
Our office is at 17/F Supreme Commercial Building, 368 King’s Road, North Point, Hong Kong (Mon–Fri 8:30am–5:30pm, +852 2895 2254, info@threegon.com). Our tooling, injection molding and assembly factories are in Guangming, Shenzhen.
How long tooling takes
Simpler single-cavity tools typically reach first samples (T0) in 4–6 weeks after design freeze. Multi-cavity, overmold, side-action or tight-tolerance medical tools typically take 6–10 weeks. You get a project-specific schedule with the quotation.
Proof and certifications
Passed The Home Depot responsible sourcing factory audit (Sept 2026). Our Shenzhen factory is certified to ISO 9001 and ISO 13485, and our greenhouse gas reporting is verified to ISO 14064-1. Our cleanroom assembly area tests to ISO 14644-1 “ISO 7” (equivalent to FED STD 209E Class 10,000).
ISO 9001 certificate (PDF) · ISO 13485 certificate (PDF) · ISO 14064-1 greenhouse gas verification statement, 2020 (PDF) · Sustainability and carbon reporting

03 · MANUFACTURING
Molding, assembly and medical cleanroom
Injection molding and final assembly, ready for retail, plus ISO 13485 cleanroom assembly for medical plastic products.
ISO 13485 cleanroom assembly: what to expect
FAQ
Frequently asked questions
What does Threegon do?
Threegon is a product development and contract manufacturing company based in Hong Kong with its own factories in Guangming, Shenzhen. We take plastic-engineered products from design through DFM, injection mold tooling, injection molding and final assembly, ready for retail.
Who do you work with?
Brand owners bringing new products to market, and industrial design firms that need a manufacturing partner for their clients’ designs.
Do you work with industrial design consultancies?
Yes. We are an OEM-only service set up to collaborate with designers, engineers and industrial design consultancies. We give early DFM input and work to maintain the integrity of the original design through production.
How long does injection mold tooling take?
Simpler single-cavity tools typically reach first samples (T0) in 4–6 weeks after design freeze and material confirmation. Multi-cavity, overmold, side-action or tight-tolerance medical tools typically take 6–10 weeks. You get a project-specific schedule at the quotation stage.
Do you make your own tooling?
Yes. Tool design and machining are done in-house at our Shenzhen tooling and injection molding factory, which reduces hand-off delays between toolmaker and molder.
Can you manufacture medical device components?
Yes. We provide ISO 13485 cleanroom assembly for medical plastic products, with the documentation and process controls that come with it.
How do you protect my design and IP?
We exchange an NDA before you share design files, and we work only as an OEM for your brand.
How long has Threegon been in business, and what audits have you passed?
Threegon has 20+ years in business. Passed The Home Depot responsible sourcing factory audit (Sept 2026).

04 · QUALITY & SHIPPING
Quality checked, then shipped
We define the quality control plan, test the product, then ship where there is demand.
How to ship samples to our Shenzhen factory
Have a product ready to make?
Tell us about your product. We can sign an NDA before you share design files.
Prefer email? info@threegon.com · +852 2895 2254